Greg Smith's Blog Posts
Building resumed... (2020-03-01)I've resumed building the 7.5" V2 with a 75mm motor mount. I applied the fin fillets last night: I still need to seal the exterior and sand it smooth. I've had Aeropoxy Light in my ... [Read More]
Sponsored Ads